Moving trams and railed bogies
Bogies, carriages and whole trams moved round the depot on rails by one operator, without powering up.
At a glance
- Result
- Up to 300,000 kg on rails
- Industry
- Rail
The challenge
Tens of tonnes in a tight depot
Train and tram maintenance depots move bogies, carriages, HVAC systems and complete vehicles weighing tens of tonnes. Space is tight, and powering a vehicle up to shunt it, or bringing in cranes and heavy plant, is slow and costly.
The solution
A rail tug that pushes the vehicle
The TP2000 moves up to 200,000 kg on rails and the TP3000 up to 300,000 kg. The operator stands clear of the load with a full view, and wireless radio control adds smooth, slow-speed positioning.
At Sheffield Supertram, a TP3000 lines trams up over the wheel lathe with the tram powered down: read the case study.
The result
What changes
- No need to power vehicles up to move them
- Accurate positioning over lathes, pits and jacks
- Fewer people on each move, and a safer job
The machine on this job
Moving something similar?
Tell us what you’re moving and how it runs, and we’ll tell you which tug and coupling will do the job.
Rather talk it through? Call 01538 360372.




















